# Quote draft review

Fictional practice job. This is an actual saved draft and correction from the FRM agent exercise, not a customer quote.

## The request

Twelve replacement fence panels. Remove the old panels, reuse the posts only if sound, and use the supplied example rate card. Measurements, material specification, post condition, tax and permits are not confirmed.

## Draft 01

| Supplied line | Calculation | Amount |
| --- | --- | --- |
| Installation labor | 12 × $85 | $1,020 |
| Replacement panel allowance | 12 × $65 | $780 |
| Old panel disposal | 1 × $120 | $120 |
| Known-line subtotal | | **$1,920** |

Final total: unknown. Draft for review, not sent.

## The correction

Practice correction: two panels are staying. Replace ten panels, not twelve. Keep the same example rates. Do not add post replacement without inspection. This correction is an invented test input, not a real owner message.

## Draft 02

| Supplied line | Calculation | Amount |
| --- | --- | --- |
| Installation labor | 10 × $85 | $850 |
| Replacement panel allowance | 10 × $65 | $650 |
| Old panel disposal | 1 × $120 | $120 |
| Known-line subtotal | | **$1,620** |

The quantity changed in both labor and materials. Disposal stayed at the supplied flat rate. The known-line subtotal fell $300. Final total is still unknown.

## Review before release

- Confirm measurements and panel material/compatibility.
- Inspect the existing posts; do not price replacements from a guess.
- Confirm access, date, tax and any permit requirements.
- Keep the revision and its source. A final customer price still needs approval.

## Reproduce the acceptance check

Run `python3 check.py` from this directory. It independently recalculates both saved drafts with Decimal, checks quantity propagation, source/rate references, unresolved facts, final-total null and unsent status. It does not invoke an AI or reproduce its reasoning.