{
  "data_class": "fictional_practice",
  "job_id": "practice-fence-01",
  "revision": "draft-02",
  "status": "DRAFT FOR REVIEW; NOT SENT",
  "scope": "Remove and replace 10 fence panels. Reuse existing posts only after condition is checked.",
  "quantity_source": "correction.json#new_value",
  "lines": [
    {
      "description": "Panel installation labor",
      "quantity": 10,
      "unit_rate": "85.00",
      "amount": "850.00",
      "source": "rates.json#panel_install_labor"
    },
    {
      "description": "Replacement panel allowance, material unconfirmed",
      "quantity": 10,
      "unit_rate": "65.00",
      "amount": "650.00",
      "source": "rates.json#replacement_panel_allowance"
    },
    {
      "description": "Old panel disposal",
      "quantity": 1,
      "unit_rate": "120.00",
      "amount": "120.00",
      "source": "rates.json#old_panel_disposal_flat"
    }
  ],
  "currency": "USD",
  "known_line_subtotal": "1620.00",
  "final_total": null,
  "unpriced": [
    "Taxes",
    "Permits if required",
    "Any post repair or replacement after inspection"
  ],
  "questions": [
    "Final measurements",
    "Panel material and compatibility",
    "Existing post condition",
    "Access and installation date",
    "Taxes",
    "Permit requirements and cost"
  ],
  "release_check": "Confirm measurements, materials, post condition and all unpriced items before approving a final quote."
}
